banner
News

Advance Engineered Products Launches Second Generation Wet/Dry Combination Units
The Advance Engineered Products Group announced today that it has completed the manufacture of two Second Generation Wet/Dry Combination units (wet/dry combos) for delivery to a major North American carrier. The order was given in 2010 to replace the First Generation units which were placed in service in 1988 and 1990 and recently retired after many years of service.
Two Way Haul
“Eliminates empty miles and hauls up to 94% incremental payload over conventional one-way petroleum and pneumatic b-trains”

Features:

- 53,000 litre liquid capacity over 4 compartments
- 1,400 cubic feet of dry bulk capacity over 2 compartments which feed 3 hoppers
- TC406 coded liquid compartments
- Custom-built to meet your needs with various options available
Typical Payload Comparison Chart: *
*including tractor, driver, and fuel as spec’d by AEPL @ 15°C
Wet/Dry Combination Units
Download PDF
Contact:
Doug Kee Jr.
Manager, National Accounts
dougkee@aepl.ca
306.721.5678

OTHER NEWS
• August 2, 2011 – Raymond Hicton Passed Away Aug 2, 2011
• June 6, 2011 – Custom Manufactured Trailers
• June 1, 2011 – FTR Forecasts 257% Increase in Production Between 2009 and 2013 a 100% Increase From Early
• March 30, 2011 – Advance Introduces the New Super 407
• March 30, 2011 – Full-Vac Tridem Trailer
• January 1, 2011 – Demand for Trailers Begins to Snowball, But Industry Keeping Up So Far